Crude Palm Oil
Delivery: Via lorry tanker (Malaysia) or packed in 20MT container flexibag for export
Specifications:
PORAM Standard Specifications:-
Free Fatty Acid (FFA): 5.0% max at time of delivery/shipment
M&I: 0.25% max
Iodine Value: 50-55
DOBI: 2.31 min
Slip Melting Point: 33-39oC
Price: Mutually agreeable price, subject to prevailing market price
Payment Term: To be discussed
Palm Oil Mill Effluent (POME) / Sludge Palm Oil (SPO)
Delivery: Via lorry tanker (Malaysia) or packed in 20MT container flexibag for export
Specifications:
PORAM Standard Specifications:-
Free Fatty Acid (FFA): up to 70% max at time of shipment
M&I: 3% max
TFM: 97% min at time of shipment
Price: Mutually agreeable price, subject to prevailing market price
Payment Term: To be discussed
Solid Scum (Solid POME)
Own collection: ex-pond at mill
Price: Mutually agreeable price
Payment Term: To be discussed

Spent Bleaching Earth Oil (SBEO) / Palm Acid Oil / Residue Oils (from oleochemical refining acidulated soapstock)
Delivery: Via lorry tanker (Malaysia) or packed in 20MT container flexibag for export
Specifications:
PORAM Standard Specifications:-
Free Fatty Acid (FFA): up to 70% max at time of shipment
M&I: 3% max
TFM: 97% min at time of shipment
Price: Mutually agreeable price, subject to prevailing market price
Payment Term: To be discussed

Delivery: Via lorry tanker (Malaysia) or packed in 20MT container flexibag for export, or packing as per customer's request (PET bottle, Jerrycan, drum, etc.)
Specifications:
PORAM Standard Specifications:-
Free Fatty Acid (FFA): 0.1% max
M&I: 0.1% max
Slip Melting Point: 24oC maxIodine Value: 60 min / 57 min / 56 min (subject to customer's request)
Cloud Point: 6.0oC max / 8oC max / 10oC max (subject to customer's request)Colour (5 1/4"): 3.0 Red Max
Price: Mutually agreeable price, subject to prevailing market price
Payment Term: To be discussed

Delivery: Via lorry tanker (Malaysia) or packed in 20MT container flexibag for export
Specifications:
PORAM Standard Specifications:-
Free Fatty Acid (FFA): 70% min
M&I: 1% max
Price: Mutually agreeable price, subject to prevailing market price
Payment Term: To be discussed